Structure Guard®: Protect Against the Toughest Corrosion
With a rapid cure time and a smooth finish, Structure Guard epoxy is the trusted, versatile way to protect and renew wastewater infrastructure assets.
- Sprays on 100% solids, high-build epoxy coating
- Protects against extreme corrosion and abrasion
- Formulated for manholes, pump stations, treatment plants and other structures
- Transforms degraded pipes into resilient assets
GET IN TOUCH Talk To A Pro About Structure Guard
Complete Protection Structure Guard Withstands Extreme Wear

Versatile Protection
Structure Guard is ideal for municipal and industrial applications, providing both structural enhancement and corrosion prevention.


Trusted and Proven
Structure Guard’s performance is backed by rigorous testing and real-world use in the most aggressive and turbulent environments.


Rapid-Set Formula
Structure Guard sets fast to limit downtime and disruption and can handle light load within one hour, and immersion in four.


SEWER REHAB NEAR MASS GENERAL HOSPITAL
Pipe Relining Eliminates Need To Dig Up Old Brick Sewer Near Hospital’s Entrance
Problem: Deteriorated and leaking brick sewer interceptor serving Massachusetts General Hospital and located in front of the ER entrance.
Solution: Quadex Lining System® (QLS) GeoKrete® was applied in areas where CIPP could not be performed due to headwalls and other obstructions. The versatile application options of QLS/GeoKrete allow the non-round sections of the interceptor to be fully restored when there was no other viable option. Traditional CIPP was installed in rounded sections of interceptor.
Read The Case Study

PROVEN EPOXY DELIVERS LONG-LASTING DURABILITY
Structure Guard® Fully Restores Critical Water Reclamation Facility Pipe
Problem: A critical 94” RCP main servicing a water treatment plant showed active infiltration and severe corrosion from the high H₂S environment.
Solution: Structure Guard, an extreme corrosion resistant coating, was applied to protect the pipeline from further deterioration, resolve the perpetual infiltration problem, and add structural enhancement. The facility was restored in 19 days without operational interruption.
Read The Case Study
